top of page
Search

River House framing completed

  • Writer: Francis Lapointe
    Francis Lapointe
  • Feb 13, 2012
  • 1 min read

Mike Holmes' crew has been framing River House, despite all the rain this spring. Both the house and the garage are taking shape. Tarps are covering the flat roof sections to avoid water getting into the house prior to the roofing membranes being installed. Unfortunately, the tarps obscure the usual connection to the Credit River!


 
 
 
Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

© Copyright 2001 Lapointe Architects

bottom of page