top of page

(Re)Source Pavillion Concrete Poured

Staff from Lapointe Architects spent the day yesterday experimenting with bending the wood siding and preparing for the pouring of the concrete for the foundations for the pavilion. Once the concrete had set for an hour or so, steel re-bar dowels were added to anchor the Durisol wall to the foundation system. Next weekend the Durisol wall will be raised.


Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square

© Copyright 2001 Lapointe Architects

bottom of page