Search
(Re)Source Pavillion Concrete Poured
- Francis Lapointe
- Apr 17, 2009
- 1 min read
Staff from Lapointe Architects spent the day yesterday experimenting with bending the wood siding and preparing for the pouring of the concrete for the foundations for the pavilion. Once the concrete had set for an hour or so, steel re-bar dowels were added to anchor the Durisol wall to the foundation system. Next weekend the Durisol wall will be raised.